• Home
  • About us
  • News
  • Products
  • Capabilities
  • Quality
  • Services
  • Employ
  • Contact us
Cementing manifold

Cementing manifold

Date:2012-09-28
Source:http://www.hzdjm.com/en/gjgh/112.html

  • Details

The cementing manifold is used to control the cement discharged by the cementing pump to be transported to the wellhead, completing the cementing operation

Work pressure: 2000Psi~15000Psi

Nominal diameter: 2 "to 4" (50mm to 100mm)

Working media: cement, oil, natural gas, mud

Working temperature: -46 ℃~121 ℃ (L.U level)

Material level: AA, BB, CC, DD, EE, FF, HH

Specification level: PSL3 to PSL4

Performance level: PR1~PR2


Contact Us

Tel:+86-0517-87221172

Tel:+86-0517-87221123

Email:hzdongjun@hzdjm.com

Addr:No.10, North four, Economic Development Zone Hongze,Jiangsu Province, China

二维码

Mobile browsing

Copyright © 2008-2024 HongZe DongJun Machinery Co.,Ltd苏ICP备19013501号 SITEMAP 无锡网站制作:无锡盘古